top of page
FTD Logo
1.jpg
c67c83_dcf653c09f0d4ceca2d15ee644005a43~mv2.avif
PTS_b_nobg.avif

$575.00

Designed specifically for scheduling Islamic calls to prayer, this audio playback scheduling plugin for Q-SYS™ ensures timely and accurate audio cues, catering to the unique needs of religious institutions.

Downloads:

Licensing Agreement

Features:

7 Different Calculation Methods

  • Support for seven prayer time calculation methods for different geographical regions:

    • Egyptian General Authority of Survey

    • Islamic Society of North America

    • Majlis Ugama Islam Singapura

    • Muslim World League

    • Umm al-Qura University, Makkah (default)

    • Union des Organisations Islamiques de France

    • University Of Islamic Sciences, Karachi

c67c83_cf8fa112a95343919922771eaa82d050~mv2 (1).avif

Automatic Calculation

  • Prayer times are calculated automatically by the plugin each day using the appropriate calculation method

Built-in Audio Player

  • A built-in audio player makes setup simple, allowing for different audio files to be automatically played at each prayer time

Additional Event Triggers

  • Optional pre- and post-prayer triggers allow for flexibility and custom control, such as BGM control and additional announcements

  • Sunrise and sunset times are also connected to their own triggers

c67c83_05e349b10c6646359eaf064933e0ae17~mv2 (1).avif

Accurate Synchronization

  • NTP or GPS synchronization are used to ensure the Prayer Time Scheduler clock is always accurate.

Internal NTP

  • The Network Time Protocol (NTP) client is implemented inside the Prayer Time Scheduler plugin, allowing for multiple NTP sources and detailed error reporting.

Dedicated GPS Support

  • No internet or local NTP server? Use a GPS receiver to always keep Prayer Time Scheduler on the right time at any location, no internet required.

  • Capture your exact latitude and longitude for the GPS receiver.

  • Supports any standard 1Hz or 5Hz NMEA 0183 Serial GPS receiver. Tested with the popular and affordable Garmin 18x LVC.

c67c83_ce5ca9ca5177412cb0dae513047b1cc5~mv2 (1).avif

Middle Eastern Customers:

  • Prayer Time Scheduler is also available through NMK Electronics. Please contact them at www.nmkelectronics.com for sales and support.

NMK LOGO 1-2.avif

FAQs

System Requirements

  • Q-SYS Core running Q-SYS v8.2 or later. Q-SYS v9.0 or later requires Prayer Time Scheduler to be updated to v1.1.0

  • GPS source (optional) if GPS clock source is desired

What GPS receivers are supported?

  • Prayer Time Scheduler is designed to work with any 1Hz or 5Hz NMEA 0183 GPS receiver that outputs the Recommended Minimum Specific GPS/Transit Data (RMC) NMEA Sentence to RS232 

    • The plugin is officially tested and supported with the popular and affordable Garmin 18x LVC and Garmin 18x 5Hz receivers

FTD Logo

Policies

Main Office

2910 Maguire Road

Suite 2008

Ocoee, FL 34761

1-407-850-8093

​

Social

Let's Create Something Cool!

Our Brands

Audio by the Bay Logo
AV Mercantile Logo
bottom of page